Parque Nacional Santa Teresa

Street level
Created at 11/01/2021 and updated at 05/04/2024
image Parque Nacional Santa Teresa

Information

Address
Vía sin nombre 27204
Directions
Decir en la puerta que se quiere pasar a cargar
Instructions
App UTE Mueve

DOWNLOAD APP

See the status of the charging points in real time in our app

Connectors

·
Connected to Electromaps
Many charging stations actually require a pass to be activated. The electropass is a universal access solution that allows you to charge your electric vehicle on a maximum of charging networks.

CCS2

x2
60 kw
Works with the Electropass

TYPE 2

x1
43 kw
Works with the Electropass

GET OUR KEYFOB

The map only shows the charging points of this location, if you want to see all of them and move freely, use our webapp

COMMENTS

2023-12-28

Están funcionando los 3

2023-09-30

en la app de UTE muestra si está en uso

2023-04-07

hay 2 pistolas de c.c para autos americanos o europeos si tenes chino comete 7 o 8 horas cargando, porque no se les ocurrio un gbt compatible para autos chinos y 1 cho para europeos o americanos hay 2 tomas rapidos para autos europeos que los carga en 30m y si tu auto es chino 8 horas que inteligentes no , hay mas de 2 mil autos chinos electricos y 50 europeos y americanos electricos que pueden ir a todo el pais sin problemas, los que trabajamos

2023-04-07

muy enojado 1 cargador c.a para auto chino lleva 7 horas 2 cargadores rapidos europeos 30 minutos cuando van a instalar un gbt auto chino, no entiendo 2 autos europeos y ninguno para autos chinos o sea gbt la verdad lamentable

2023-03-24

si usas la página de movilidad eléctrica de UTE, te dice si están ocupados.

2023-03-24

la entrada al parque es gratis si decís que vas a cargar

2023-02-22

Como ver si está ocupado antes de entrar al Parque? u otros puestos de cargas ?

2023-01-30

la semana pasada agregaron 2 cables más de 120Kw

2023-01-30

no es necesario

2022-12-28

para usar el cargador hay q pagar pa entrar al parque?

Photos

image 1 / 1

NEAREST CHARGEPOINT

Parque Nacional Santa Teresa is a charging station located in Unknown city (temporary), Departamento de Rocha. This charging station has a total of 3, of which 2 are fast charge connectors.
It was added on 11/01/2021and last updated on 05/04/2024.
We recommend that you consult the photos and comments posted by our community, as they provide useful information about the charger's condition. Once your charging session is over, you can add your own comments and photos to help other users and drivers decide where and how to charge their electric vehicle next time. 
Parque Nacional Santa Teresa isn't the charging point you need, check at the bottom of the page for your nearest charging point under "nearest charging points" and you'll see a list of other electric vehicle charging points nearby, along with their location in a parking lot, above ground and their distance in KM.
In the charging station information section, you can view everything you need to charge your vehicle. The exact address of the charging point Parque Nacional Santa Teresa is available, as well as directions on how to get there, the price of charging at this point and instructions on how to easily charge your vehicle.
For real-time status of charging points in Unknown city (temporary), Electromaps provides real-time charging point information in the application. 
If this Unknown city (temporary) charger isn't right for your car, there are other solutions. You can check out other chargers in Unknown city (temporary) or travel to other cities such as  , as they are nearby and located in Departamento de Rocha.