CHOCOLATES TRAPA 01 is a charging station located in Dueñas, Palencia. This charging station has a total of 3, of which 2 are fast charge connectors.
It was added on 15/11/2023and last updated on 02/05/2024.
We recommend that you consult the photos and comments posted by our community, as they provide useful information about the charger's condition. Once your charging session is over, you can add your own comments and photos to help other users and drivers decide where and how to charge their electric vehicle next time.
CHOCOLATES TRAPA 01 isn't the charging point you need, check at the bottom of the page for your nearest charging point under "nearest charging points" and you'll see a list of other electric vehicle charging points nearby, along with their location in a parking lot, above ground and their distance in KM.
In the charging station information section, you can view everything you need to charge your vehicle. The exact address of the charging point CHOCOLATES TRAPA 01 is available, as well as directions on how to get there, the price of charging at this point and instructions on how to easily charge your vehicle.
For real-time status of charging points in Dueñas, Electromaps provides real-time charging point information in the application.
If this
Dueñas charger isn't right for your car, there are other solutions. You can check out other chargers in
Dueñas or travel to other cities such as
Palencia,
Aguilar de Campoo,
Villalobón, as they are nearby and located in
Palencia.
COMMENTS
Todo perfecto con combo 2, carga acompañada de un buen chocolate.
Marca 43KW pero cargas a 10Kw y gracias. Caro para ser una carga lenta.
carga a 8.4 con suerte
esta sobrecalentado y no carga
Todo perfecto
En los 2 postes el AC carga máximo a 9 kW en un Zoe
El cargador tipo 2, carga a menos de 10 kW. Un churro total
Todo Correcto.
hoy he vuelto a cargar y he probado el otro cargador, va a 45kw. El de la derecha es el que funciona correctamente, si tienes prisa usa ese
Cargan solo a 20kw, una estafa para 0,45 el kwh
Carga a 22 el CCS
El de la derecha da error de carga
En la aplicación de Iberdrola dicen que son de 43, solo cargan a 9
funcionando sin problemas. A sobre 40 43 kwh
cargan a 8 kW probados los 2 postes
A fecha 13 de abril, siguen sin estar operativos.
A fecha 25 de Marzo de 2023, todavia no operativo.