McDonald´s Torrejón II 01

Street level
Created at 12/11/2022 and updated at 07/07/2024
image McDonald´s Torrejón II 01

Information

Address
165 Avenida de la Constitución 28850
Instructions
Free publicly accessible

DOWNLOAD APP

See the status of the charging points in real time in our app

Connectors

·
Connected to Electromaps
Many charging stations actually require a pass to be activated. The electropass is a universal access solution that allows you to charge your electric vehicle on a maximum of charging networks.

CCS2

x1
50 kw
Works with the Electropass

CHAdeMO

x1
50 kw
Works with the Electropass

GET OUR KEYFOB

The map only shows the charging points of this location, if you want to see all of them and move freely, use our webapp

COMMENTS

2024-01-10

Took over 10 tries until it finally started charging. Stopped after 0.5kW

2023-06-25

No me llegaba el pedido de cobro a la tarjeta de crédito

2023-05-08

Cargando perfectamente desde la app de Iberdrola. Para al 90%

2023-04-27

Sólo he recargado 1 día y sin problemas. Todo perfecto.

2023-03-26

Funciona bien.

2023-03-07

son gratuitos?

2023-02-09

es el mismo conector que el de Iberdrola que aparece al lado

2023-01-27

Ya están operativos.

2023-01-26

10:30 la puerta de acceso cerrada

2022-12-16

Siguen sin funcionar.

2022-11-28

Operativo al 100%

2022-11-11

Ya operativos según la app de Iberdrola

2022-07-29

Pues eso, siguen fuera de servicio

2022-06-11

Menudo desperdicio, están los puestos en un sitio estratégico que podrían ser usados por cientos de usuarios al ser una vía comercial y de ocio muy frecuentada, pero están desactivados.

2022-06-01

No tiene nombre esto... Imperdonable tener ahi los puntos sin operar desde mas de un año.

2022-05-26

¡Qué despedido de dinero!, después de más de un año y siguen sin activarse, es vergonzoso. Mal por Iberdrola y mal por McDonald's.

2022-05-07

no funciona

2021-12-19

Alguien puede fotos de los puestos de carga?

2021-12-05

5 de diciembre y siguen sin estar operativos.

2021-11-12

a dia 12 noviembre siguen igual y sin noticias de cuando estaran operativos

2021-11-03

a día de 2 de noviembre del 2021 aún siguen sin ser operativos

2021-09-05

Se sabe fecha de apertura??

2021-08-11

Siguen sin funcionar a día de hoy...

2021-04-27

Aún no funcionan

Photos

image 1 / 11image 2 / 11image 3 / 11image 4 / 11image 5 / 11image 6 / 11image 7 / 11image 8 / 11image 9 / 11image 10 / 11image 11 / 11

NEAREST CHARGEPOINT

McDonald´s Torrejón II 01 is a charging station located in Torrejón de Ardoz, Madrid. This charging station has a total of 2, of which 2 are fast charge connectors.
It was added on 12/11/2022and last updated on 07/07/2024.
We recommend that you consult the photos and comments posted by our community, as they provide useful information about the charger's condition. Once your charging session is over, you can add your own comments and photos to help other users and drivers decide where and how to charge their electric vehicle next time. 
McDonald´s Torrejón II 01 isn't the charging point you need, check at the bottom of the page for your nearest charging point under "nearest charging points" and you'll see a list of other electric vehicle charging points nearby, along with their location in a parking lot, above ground and their distance in KM.
In the charging station information section, you can view everything you need to charge your vehicle. The exact address of the charging point McDonald´s Torrejón II 01 is available, as well as directions on how to get there, the price of charging at this point and instructions on how to easily charge your vehicle.
For real-time status of charging points in Torrejón de Ardoz, Electromaps provides real-time charging point information in the application. 
If this Torrejón de Ardoz charger isn't right for your car, there are other solutions. You can check out other chargers in Torrejón de Ardoz or travel to other cities such as  Madrid, Alcobendas, Arroyomolinos, as they are nearby and located in Madrid.