Ayuntamiento de Madrid 5D is a charging station located in 28021, Madrid. This charging station has a total of 5, of which 4 are fast charge connectors.
It was added on 29/05/2023and last updated on 11/06/2024.
We recommend that you consult the photos and comments posted by our community, as they provide useful information about the charger's condition. Once your charging session is over, you can add your own comments and photos to help other users and drivers decide where and how to charge their electric vehicle next time.
Ayuntamiento de Madrid 5D isn't the charging point you need, check at the bottom of the page for your nearest charging point under "nearest charging points" and you'll see a list of other electric vehicle charging points nearby, along with their location in a parking lot, above ground and their distance in KM.
In the charging station information section, you can view everything you need to charge your vehicle. The exact address of the charging point Ayuntamiento de Madrid 5D is available, as well as directions on how to get there, the price of charging at this point and instructions on how to easily charge your vehicle.
For real-time status of charging points in 28021, Electromaps provides real-time charging point information in the application.
If this
28021 charger isn't right for your car, there are other solutions. You can check out other chargers in
28021 or travel to other cities such as
Madrid,
Alcobendas,
Arroyomolinos, as they are nearby and located in
Madrid.
COMMENTS
Me queda cerca de casa. Pero cada vez que intento cargar el ID149106 y 149107 no sirve. el 05 a veces. pero son muy malos
0,55€ el de 100kWh y 0,45€ el de 50kWh.
Una vergüenza estos puntos. De tres cargadores, los dos de 100kwh no funcionan, y el de supuestamente de 50kwh va a la mitad de potencia. No me digan que es repartido porque los puntos que he estado de 50kwh iban a esta potencia y el precio ya es de risa con este servicio sobretodo.
No conectados, decorativos
2 raption 100 kW 1 trio 50 kW
postes colocados
Lo están terminando de montar. Ahora esperemos que no tarden en conectarlo.
25/02/24: Aquí no hay nada y es muy necesario.
Es mentira. No existe nada de nada.
previsto para sept23, operado por Iberdrola: - 2 plazas en CC de 50 KW - 1 plaza en CA/CC de 22KW