STECKER
·
CCS2
x2
64,8 kw
Works with the Electropass
TYPE 2
x1
22,08 kw
Works with the Electropass
NÄCHSTGELEGENE LADEPUNKTE
Hotel IBIS Budget Madrid Alcorcón Móstoles
3 Avenida Móstoles 28922
0
km
Iberdrola | bp pulse MOSTOLES II
2 Travesía de Móstoles 28922
0
km
AhorraMas Alcalde Móstoles
12 Avenida del Alcalde de Móstoles 28933
1
km
AHM_MA_Móstoles_AlcaldeMóstoles_1
12 Avenida del Alcalde de Móstoles 28933
1
km
Leroy Merlin Parque Oeste Iberdrola
Calle Bruselas 28922
1
km
COMMENTS
it was good, charged using an electropass from electroverse, and everything worked as expected. top speed was at 51kw, but I guess it was a combination of the battery at 60% when I started and cold, so when it was warm, it was already reaching 90%, bit no more details on it
¡Powerdot llega al Hotel IBIS Budget Madrid Alcorcón Móstoles con 2 conectores CCS rápidos de hasta 80 kW y 1 conector AC de 22 kW totalmente disponibles para todo el que pase o se hospede en el hotel!
¡Powerdot llega al Hotel IBIS Jerez de la Frontera con 2 conectores CCS rápidos de hasta 80 kW y 1 conector AC de 22 kW totalmente disponibles para todo el que pase o se hospede en el hotel!